Find, save and share Public Notices that affect you in the area.
Search the Public Notice Portal What is the Public Notice Portal?What is the Public Notice Portal?
The Public Notice Portal carries statutory public notices published in local newspapers and is the fastest and most effective way of finding out what is happening in YOUR neighbourhood.
Search the Public Notice PortalBAE Systems is set to expand its manufacturing facility at Samlesbury as part of a major project to increase production space and support future demand.
Plans submitted to Ribble Valley Borough Council outline a large extension to the existing factory, which will stand at 17.1 metres tall and create around 1,800 square metres of additional floor space.
The new building will mostly be open manufacturing space, with some smaller areas for plant, welfare facilities and circulation.
The proposed extension will be built on an existing car park, meaning some spaces will be lost.
To address this, a new car park is planned elsewhere on the site, providing not only replacement spaces but also an overall increase of 20 car parking bays and six motorcycle spaces.
The project will see the construction of a new high-voltage substation to the north of the extension site.
This is required to power the facility and will be built in line with existing substations already operating within the site. An external plant compound is also included in the scheme.
READ MORE: Blackburn plastics manufacturer nominated in seven industry awards
READ MORE: Three East Lancs schools to benefit from 300 new nursery places at schools
The Samlesbury site, which sits between Blackburn and Preston, is a secure location with its own internal road network accessed from the A59.
The application states that the extension will not place any extra pressure on local roads and is designed to fit with the appearance and scale of the existing buildings, using the same cladding and materials.
While the development does not create new jobs directly, BAE says it will increase the company’s production capacity and help safeguard employment at one of the area’s largest workplaces.
Environmental reports submitted with the application confirm that the extension and substation sites have no ecological value, while a biodiversity offset has been secured for the new car park area, which lies on grassland.
The proposals have also been designed with sustainability in mind, including rooftop solar panels and measures to support the company’s ambition of reaching net-zero carbon.
The company says the expansion will strengthen its ability to deliver advanced manufacturing in the region and ensure the Samlesbury site remains at the forefront of engineering and production.
Share