Rail campaigners call for more trains in Blackburn to Hellifield route (From Lancashire Telegraph)
When news happens, text LT and your photos and videos to 80360. Or contact us by email or phone.
Rail campaigners call for more trains in Blackburn to Hellifield route
3:00pm Saturday 8th September 2012 in News
RAIL campaigners want to open up East Lancashire to Yorkshire and Scotland by promoting extra trains along a rarely-used route.
Friends of the Blackburn to Hellifield Line (FOBHL) are making the call 50 years to the day that the last regular passenger service between the two locations ceased.
The final train between Blackburn and the North Yorkshire station departed in early September 1962, and now only a single train operates every Sunday.
Supporters of the Friends of Settle to Carlisle Line have also undertaken a major study this year, outlining the benefits of opening a through route between Manchester and Carlisle, via Darwen, Blackburn and Ribble Valley stations.
Peter Brass, of FOBHL and a Clitheroe newsagent, said that the link could be reinstated with minimal outlay for the rail industry.
“The only thing that you would need is a signal on the platform at Hellifield for when the trains arrive from Clitheroe,” he said.
Around half a dozen trains could be run each day, he believes, which if timed correctly could connect with onwards services to Carlisle.
Such a move echoes the efforts of the Skipton East Lancashire Rail Partnership, which aims to reconnect the abandoned line between Colne and North Yorkshire.
And if it is successful it would mirror the reinstatement of the Todmorden Curve, opening up extra services to West Yorkshire and Manchester for East Lancs passengers.
Paul Levet, of FOSCL, added: “Manchester, Bolton, Blackburn and Clitheroe only have connections to the Yorkshire Dales on Sundays during the summer season. A yearly round service would improve this situation.”
And because the track, used by the Sunday service, freight trains and charter operators, is still in place, FOSCL is arguing that it would not require any expensive overhauls.
Mr Levet added: “Clitheroe travellers to Scotland have to change at Blackburn and Preston when they could enjoy a more direct service via the scenic Settle and Carlisle line.
“And travel to Skipton and Leeds from Clitheroe could also be improved by connecting Clitheroe to Hellifield.”The Hellifield line, which also calls from Blackburn, at Ramsgreave and Wilpshire, Langho and Whalley, before Clitheroe, was originally part of the Lancashire & Yorkshire Railway.
Comments are closed on this article.
Comments (17)
3:25pm Sat 8 Sep 12
mavrick says...
3:32pm Sat 8 Sep 12
Michael@ClitheroeSince58 says...
4:23pm Sat 8 Sep 12
Reality50 says...
4:26pm Sat 8 Sep 12
Reality50 says...
4:42pm Sat 8 Sep 12
shytalk says...
5:50pm Sat 8 Sep 12
lcjfm03 says...
6:45pm Sat 8 Sep 12
Noiticer says...
Any new service would have to regular to make it attractive - the idea that many people living beyond Heelifield would use it to reach Manchester Airport is pie in the sky as many flights are at inconvenient times. Also waiting facilities at Hellifield are minimal with no inside space or toilets available so changing trains there wouldn't be a very attractive proposition. Travelling to Leeds from Clitheroe would still be quicker via Blackburn.
So, unless the supporters of this campaign can come up with some viable plans then the obstacles are still weighed against them.
6:56pm Sat 8 Sep 12
ROBERTSLUMDWELLER123 says...
12:17am Sun 9 Sep 12
Reality50 says...
1:53am Sun 9 Sep 12
2 for 5p says...
Yes bring it on.
7:38am Sun 9 Sep 12
Excluded again says...
The world has changed since 1962 and there are many short rail lines around the country which have re-opened and survive as tourist and pleasure lines. A line connected to the national network could benefit from all this business plus a small amount of commuting/business traffic.
8:52am Sun 9 Sep 12
Noiticer says...
6:48pm Sun 9 Sep 12
deltic08 says...
The DfT needs to put this in the forthcoming Northern Franchise bid as an experimental service for (say) 12 months to determine usage. Jack Straw MP is very supportive of the proposal. Lobbying should be directed through him.
Dont forget, we only have a few more years of affordable oil remaining then we will all be using electrified trains!!
6:49pm Sun 9 Sep 12
deltic08 says...
The DfT needs to put this in the forthcoming Northern Franchise bid as an experimental service for (say) 12 months to determine usage. Jack Straw MP is very supportive of the proposal. Lobbying should be directed through him.
Dont forget, we only have a few more years of affordable oil remaining then we will all be using electrified trains!!
6:03pm Mon 10 Sep 12
s_smith says...
.
It is 1hr 48 mins Carlisle to Hellifield, and about 1hr 33mins Hellifield to Manchester Victoria (3hrs 21mins, assuming a direct service Carlisle to Victoria). Yet via the WCML to Manchester it is around 2hrs, depending on the service used.
.
Or lets look at it another way: Clitheroe to Carlisle. 2hrs 21mins via Blackburn and Preston. Going via the S&C it is around the same time, assuming a direct service, which it wont be. And lets think about the number of services calling at Hellifield. To get to Carlisle before 9am from Clitheroe will be impossible with the current timetable - but lets not forget that its not just a case of "getting another train to stop there"; where will that train come from, where will it be going to, what service is it running next, is there enough time in the timetable for it to stop there and continue its service pattern.
.
Im sorry, it sounds like a lovely idea, but what good will it serve? None.
12:27am Tue 11 Sep 12
deltic08 says...
How many care if a journey to Carlisle via Hellifield is longer than via Preston. On this route, to travel is far better than to arrive. If you live in Appleby or Settle or even Skipton, this would be the fastest way to Manchester.
As 270,000 used Clitheroe station last year, up 11% from the previous year, who knows how many more would use it if they could travel north as well.
It is still logical as Hellifield is only 11 miles beyond Clitheroe and a three way junction providing opportunity and connectivity to travel in a greener mode than by road. Yes, another unit and crew will be required but after electrification of Manchester-Earlestow
n in December 2013 there will be at least 9 cascaded units available and many more in 2016 when the whole Lancashire triangle is completed.
Of course, the professionals would need to look at costings, rostering and timetabling but that doesn't stop the user group pressing ahead with their campaign to raise awareness of the possibility. A revenue/demand forecast would confirm but cost £10-12,000 or just under £1 per head of population of Clitheroe.
Good luck to Peter Brass and his group. They show foresight.
9:49pm Sat 15 Sep 12
deltic08 says...
Looking at photos of Blackburn trains in the south bay platform at Hellifield in 1962 just before the service ceased, the quality of passenger comfort was lacking. Compartment coaches without corridors, therefore no toilets. No wonder the line was underused and closed.